Joe Deck
Challenge
Our client are in the gas exploration market. When drilling for new wells, they have to set up temporary processing equipment for well testing. This takes place for at least 6 – 9 months, where they take well fluids and separate them, such as gas, oil, water – the oil gets stored on site and is classed as HSNO 3.1A.
Our client came to Fuelchief to discuss plans to build a SuperVault, as the only other alternative for storing a flammable liquid involved a concrete bund as a permanent structure. They also required some additional features, such as brackets for a custom walkway and pipework.
Solution
The SuperVault was the obvious choice for the flammability of the product, meaning the customer could relocate the tank once testing was finished. It saves them investing in concrete bunds and a permanent installation that would have a limited life span for the client.
Outcome
The outcome was rather different to what most of our tanks look like! The client mounted the SuperVault on a purpose-built skid frame with load-out pump system. This solved the flammability compliance issue and allowed the client to purchase an asset that they can use time and time again, on different sites as they develop.
Related Case Studies
Joe Deck
Fuelchief teamed up with Terra Cat to provide a Fuelchief DCD100 diesel fuel tank to Powerco for critical power backup.
Joe Deck
Our latest SuperVault case study on a how our 4-hour fire rated tank replaced an underground fuel tank for the University.
Joe Deck
Fuelchief supplies tank to Sandspit Marina, view the latest results of the transaction and why the manager is looking for another tank from us.
Joe Deck
The Fuelchief SuperVault 4 hour fire rated fuel tank was custom made to ensure the critical environment of a aviation control tower was met.
Joe Deck
See how the SuperVault Cylindrical 4 hour fire rated tank ensured refuelling compliance for NZ Bus. Check out the latest case study.