Backup Power for

Mission-Critical Fuel Solutions

For Hospitals and Public Health

When the grid fails, patient care cannot. Hospitals, acute facilities and public health infrastructure require fuel systems that are compliant, resilient and engineered to perform when they are needed most. We design, manufacture and install mission-critical fuel solutions that protect continuity of care.

The Fuelchief System We take full ownership from concept, to commissioning and compliance.

Healthcare projects involve multiple stakeholders, tight programmes and strict regulatory oversight. Our role is to remove uncertainty across the fuel system lifecycle.

Design

Early-phase design support that aligns fuel storage with fire rating, seismic demands and spatial constraints.

Fire & hazardous integration

Aligned to AS1940, WorkSafe and healthcare facility standards.

Fire & hazardous integration
Seismic coordination

Engineered for IL4 and critical building classifications.

Seismic coordination
Spec & consent support

Drawings, compliance matrices and documentation prepared for review.

Spec & consent support
Manufacture

Built to meet healthcare fire-rating, durability and environmental protection requirements.

Certified fire-rated systems

True 4-hour fire rating with SwRI certification.

Certified fire-rated systems
Clean fuel integrity

Designed to protect generators operating in 24/7 environments.

Clean fuel integrity
Precision fabrication

Manufactured to approved drawings and exact site constraints.

Precision fabrication
Install

Installed with discipline in live healthcare environments, where coordination and safety matter.

Controlled site execution

Cranage, access and sequencing aligned to hospital operations.

Controlled site execution
Compliance closed on site

Fire integrity and hazardous requirements verified and documented.

Compliance closed on site
Commissioning alignment

Integrated with generator suppliers for seamless startup.

Commissioning alignment

Remove the Pressure of Installation

If things change on installation day, we can adapt. Our role is to control the variables that matter, coordination, compliance and commissioning, so that the installation doesn’t add pressure to your programme of work.

Installed to approved drawings, verified against fire and seismic requirements, documented for consent.

Coordinated Site Execution

We manage cranage planning, lifting methodology, access constraints and sequencing alongside Tier 1 contractors. Vent routes, slab loads and penetrations are verified before install,  reducing interface risk and protecting programme milestones.

Coordinated Site Execution
Compliance Closed on Site

Installation is completed to approved drawings and documented against fire, seismic and hazardous requirements. As-builts, certifications and commissioning records are prepared for smooth consent sign-off.

Compliance Closed on Site
Low Friction Commissioning

We align installation with generator suppliers and electrical teams, verifying reticulation, controls and venting prior to startup. The system is handed over clean, tested and ready for load.

Low Friction Commissioning

IL4 and post-disaster ready

Engineered to remain operational when the building must continue functioning.

True 4-hour fire-rated solutions

Certified systems aligned to AS1940 and healthcare fire strategies.

Consent-ready documentation packs

Drawings, certifications and compliance matrices prepared.

Commissioned for live environments

Integrated carefully within operational hospitals without disrupting critical services.

Health Case Studies

Christchurch Hospital
Health
01 May 2026

Christchurch Hospital

Chirstchurch Hospital, consultants needed a SuperVault tank to back up critical generators to ensure continual power in an outage.

Joe Deck Joe Deck

Your key contacts for health

Our engineers and project managers know how to deliver fuel systems into live, high-stakes environments like hospitals.

Frequently Asked Questions

What fire rating is required for hospital fuel storage?

Most hospital projects require 4-hour fire-rated fuel storage where volumes exceed regulatory thresholds, aligned to AS1940 and local authority requirements.

faq arrow
Do hospital fuel tanks need seismic engineering?

Where buildings are classified for high importance or post-disaster function, fuel systems must be engineered to remain operational after seismic events.

faq arrow
Can a fire-rated tank replace a fire-rated room?

In many healthcare projects, a certified 4-hour fire-rated tank can reduce footprint and simplify the overall fire strategy.

faq arrow
How is hazardous compliance managed in hospitals?

Compliance is addressed through correct tank selection, ventilation design, hazardous area classification and a documented approval pathway aligned to local regulations.

faq arrow
What are common design risks in hospital fuel systems?

Spatial constraints, late compliance interpretation and coordination gaps between fire, structural and electrical disciplines are typical risk areas.

faq arrow
How is commissioning handled in live healthcare facilities?

Commissioning is staged and coordinated with facilities and generator teams to verify performance without disrupting hospital operations.

faq arrow

If you need critical power and a partner you can rely on, let’s talk.

Phone
(New Zealand & United States)

Phone
(Australia)

Postal Address

Our PO Box
P.O Box 160175
Hornby, 8441

Customer Support

We are here to help. Contact us any time and one of our friendly team will help.